Difference between revisions of "Project Meetings Minutes"
From D4Science Wiki
m (→2nd TCom Meeting, Rhodes (Greece), June 2012) |
(→2012 Conference Calls) |
||
Line 64: | Line 64: | ||
<font color=red>13.02.2012 Costing</font> | <font color=red>13.02.2012 Costing</font> | ||
[[21.02.2012 SPREAD Specification | 21.02.2012 (SPREAD)]] | [[21.02.2012 SPREAD Specification | 21.02.2012 (SPREAD)]] | ||
− | + | [[28.02.2012 SDMX Workshop Luxembourg]] | |
| align="center" | <!-- Infrastructure MINUTES --> [[14.02.2012 Production Ecosystem Conference Call | 14.02.2012]] | | align="center" | <!-- Infrastructure MINUTES --> [[14.02.2012 Production Ecosystem Conference Call | 14.02.2012]] | ||
| align="center" | <!-- SW Integration MINUTES --> | | align="center" | <!-- SW Integration MINUTES --> |
Revision as of 15:43, 8 May 2012
This pages links to the minutes produced in all project meetings (face-to-face and conference calls).
TCom Meetings
1st TCom Meeting, Rome (Italy), 14th-16th March 2012
1st TCom Meeting: Participants
1st TCom Meeting: 14th March 2012 Discussions and Notes
1st TCom Meeting: 15th March 2012 Discussions and Notes
1st TCom Meeting: 16th March 2012 Discussions and Notes
2nd TCom Meeting, Rhodes (Greece), dd-dd June 2012
2nd TCom Meeting: Participants
Conference Calls
2011 Conference Calls
Month | PEB | Misc | Infrastructure | SW Integration | WP7 | WP8 | WP9 | WP10 | WP11 |
---|---|---|---|---|---|---|---|---|---|
Dec '11 | 05.12.2011 | 09.12.2012 2Day VME Workshop | 19.12.2011 | 19.12.2011 | 20.12.2011 | 12.12.2011 | 13.12.2011 (T10.1-4) |
2012 Conference Calls
Month | PEB | Misc | Infrastructure | SW Integration | WP8 | WP9 | WP10 | WP11 |
---|---|---|---|---|---|---|---|---|
Jan '12 | 09.01.2012 | 12.01.2012 (WP4) 31.01.2012 FAO ABNJ | 20.01.2012 (T8.2) | 17.01.2012 (T9.2) | 11.01.2012 | |||
Feb '12 | 06.02.2012 | 08.02.2012 OBIS Requirements 13.02.212 WPS/Geosolutions
13.02.2012 Costing 21.02.2012 (SPREAD) 28.02.2012 SDMX Workshop Luxembourg |
14.02.2012 | 16.02.2012 (T8.3+related) | 16.02.2012 (T10.4) | |||
Mar '12 | 05.03.2012 | 02.03.2012 ICIS Demo to JPN | 26.03.2012 | |||||
Apr '12 | 02.04.2012 | 05.04.2012 (WP3 Biodiversity)
06.04.2012 (WP3 Geospatial) 12.04.2012 (WP3 Statistical) 13.04.2012 (SPREAD Technology) 17.04.2012 CM BoI 19.04.2012 Codelist Manager (with AgInfra) 24.04.2012 (WP3 VRE List) 24.04.2012 (Biodiversity Cluster) |
20.04.2012 (T9.2) | |||||
May '12 | 07.05.2012 | 03.05.2012 Geospatial Cluster 03.05.2012 Biodiversity Call 08.05.2012 Geospatial Cluster | 08.05.2012 (WP5-WP8 - Dynamic RR configuration) |