Difference between revisions of "Project Meetings Minutes"

From D4Science Wiki
Jump to: navigation, search
(2012 Conference Calls)
(2012 Conference Calls)
Line 69: Line 69:
 
| align="center" | <!-- PEB MINUTES --> [[05.03.2012 Project Executive Board Conference Call | 05.03.2012]]
 
| align="center" | <!-- PEB MINUTES --> [[05.03.2012 Project Executive Board Conference Call | 05.03.2012]]
 
| align="center" | <!-- Misc MINUTES -->  <font color=red>02.03.2012 ICIS Demo to JPN</font>  
 
| align="center" | <!-- Misc MINUTES -->  <font color=red>02.03.2012 ICIS Demo to JPN</font>  
<font color=red>08.03.2012 Board Call with ESTAT/ICES</font>
+
[[08.03.2012 Board Call with ESTAT/ICES | 08.03.2012 Board Call ESTAT/ICES]]
 
| align="center" | <!-- Infrastructure MINUTES -->  [[26.03.2012 Production Ecosystem Conference Call  | 26.03.2012]]
 
| align="center" | <!-- Infrastructure MINUTES -->  [[26.03.2012 Production Ecosystem Conference Call  | 26.03.2012]]
 
| align="center" | <!-- SW Integration MINUTES -->
 
| align="center" | <!-- SW Integration MINUTES -->

Revision as of 14:18, 8 May 2012

This pages links to the minutes produced in all project meetings (face-to-face and conference calls).

TCom Meetings

1st TCom Meeting, Rome (Italy), 14th-16th March 2012

1st TCom Meeting: Agenda

1st TCom Meeting: Participants

1st TCom Meeting: 14th March 2012 Discussions and Notes

1st TCom Meeting: 15th March 2012 Discussions and Notes

1st TCom Meeting: 16th March 2012 Discussions and Notes

Conference Calls

2011 Conference Calls

Month PEB Misc Infrastructure SW Integration WP7 WP8 WP9 WP10 WP11
Dec '11 05.12.2011 09.12.2012 2Day VME Workshop 19.12.2011 19.12.2011 20.12.2011 12.12.2011

15.12.2011 (T9.2)

13.12.2011 (T10.1-4)

2012 Conference Calls

Month PEB Misc Infrastructure SW Integration WP8 WP9 WP10 WP11
Jan '12 09.01.2012 12.01.2012 (WP4) 31.01.2012 FAO ABNJ 20.01.2012 (T8.2)

27.01.2012 (T8.1-4)

17.01.2012 (T9.2)

20.01.2012

11.01.2012

27.01.2012

Feb '12 06.02.2012 08.02.2012 OBIS Requirements 13.02.212 WPS/Geosolutions

13.02.2012 Costing 21.02.2012 (SPREAD) 27.02.2012 BC2 28.02.2012 SDMX Workshop Luxembourg

14.02.2012 16.02.2012 (T8.3+related) 16.02.2012 (T10.4)
Mar '12 05.03.2012 02.03.2012 ICIS Demo to JPN

08.03.2012 Board Call ESTAT/ICES

26.03.2012

21.03.2012 (T8.1-4)

Apr '12 02.04.2012 05.04.2012 (WP3 Biodiversity)

06.04.2012 (WP3 Geospatial) 12.04.2012 (WP3 Statistical) 13.04.2012 (SPREAD Technology) 17.04.2012 CM BoI 19.04.2012 Codelist Manager (with AgInfra) 24.04.2012 (WP3 VRE List) 24.04.2012 (Biodiversity Cluster)

24-25.04.2012 (WP8-WP5)

20.04.2012 (T9.2)
May '12 07.05.2012 03.05.2012 Geospatial Cluster 03.05.2012 Biodiversity Call 08.05.2012 Geospatial Cluster 08.05.2012 (WP5-WP8 - Dynamic RR configuration)