Difference between revisions of "Semantic cluster"

From D4Science Wiki
Jump to: navigation, search
(Executive Summary)
(Appendix C - Schedule)
Line 34: Line 34:
 
== Appendix B - Budget ==
 
== Appendix B - Budget ==
 
== Appendix C - Schedule ==
 
== Appendix C - Schedule ==
 +
 +
 +
== Appendix D - Documents ==
 +
 +
 +
 +
 +
== Appendix D - Documents ==
 +
 +
 +
== Appendix E - Other ==
 +
 +
=== iMarine Technical Guidelines ===
 +
 +
* [http://wiki.i-marine.eu/index.php/Semantic_cluster_guidelines]

Revision as of 18:01, 13 March 2013

The main purpose of the Cluster work plan (template here) is to provide the iMarine Board with a management tool usable as a framework for planning activities, and that can serve as a guide for carrying out that work. The scope is thus the interface between the Board and the project's Work Packages activities. After drafting, a work plan needs approval from the iMarine Board, following the Board procedures.

Executive Summary

Introduction and Background (The Problems)

Goals and Objectives (The Outputs)

Resources and Constraints (The Inputs)

Strategy and Actions (from Inputs to Outputs)

Cluster Participants and Roles

Appendix A - Resources

Appendix B - Budget

Appendix C - Schedule

Appendix D - Documents

Appendix D - Documents

Appendix E - Other

iMarine Technical Guidelines