Difference between revisions of "Risk Analysis and Risk Response"
From D4Science Wiki
Line 63: | Line 63: | ||
!colspan="1" style="background: #ffdead;" | Description | !colspan="1" style="background: #ffdead;" | Description | ||
!colspan="1" style="background: #ffdead;" | Value | !colspan="1" style="background: #ffdead;" | Value | ||
+ | |- | ||
| None | | None | ||
| 0 | | 0 | ||
Line 76: | Line 77: | ||
!colspan="1" style="background: #ffdead;" | Description | !colspan="1" style="background: #ffdead;" | Description | ||
!colspan="1" style="background: #ffdead;" | Value | !colspan="1" style="background: #ffdead;" | Value | ||
+ | |- | ||
| None | | None | ||
| 0 | | 0 |
Revision as of 12:05, 28 November 2012
Introduction
The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1.
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.
Risk Management Methodology
Overview
Probability Rank | Impact Rank | ||
---|---|---|---|
Description | Value | Description | Value |
None | 0 | None | 0 |
Very Low | 1 | Doesn’t affect the activity | 1 |
Low | 2 | Affects the activity but a workaround is not needed | 2 |
Medium | 3 | Affects the activity and it's recommended to put in place a workaround | 3 |
High | 4 | Affects the activity and it's mandatory to put in place a workaround | 4 |
Very High | 5 | Affects the activity that has to be completely rethought | 5 |
Certain | 10 | Blocks the activity | 10 |
Probability Rank | Impact Rank |
---|
Description | Value |
---|---|
None | 0 |
Very Low | 1 |
Low | 2 |
Description | Value |
---|---|
None | 0 |
Very Low | 1 |
Low | 2 |