Difference between revisions of "Risk Analysis and Risk Response"

From D4Science Wiki
Jump to: navigation, search
Line 10: Line 10:
  
 
=== Overview ===
 
=== Overview ===
=== Monitoring ===
+
=== Risk Identification ===
=== Identification ===
+
=== Risk Classification ===
=== Resolution ===
+
=== Risk Monitoring ===
 +
=== Risk Resolution ===
  
 
== Identified Risks ==
 
== Identified Risks ==
  
 
== Top Identified Risks ==
 
== Top Identified Risks ==
=== Actions ===
+
=== Risk Resolution ===

Revision as of 10:42, 28 November 2012

Introduction

The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1.
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.

Risk Management Methodology

Overview

Risk Identification

Risk Classification

Risk Monitoring

Risk Resolution

Identified Risks

Top Identified Risks

Risk Resolution