== Introduction ==
 
The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at [http://bscw.i-marine.research-infrastructures.eu/bscw/bscw.cgi/239724 DNA1.1].<br>  
 
The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at [http://bscw.i-marine.research-infrastructures.eu/bscw/bscw.cgi/239724 DNA1.1].<br>  
 
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.<br>
 
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.<br>
  
== Methodology ==
+
== Risk Management Methodology ==
  
 
== Identified Risks ==
 
== Identified Risks ==
Line 13: Line 14:
  
 
== Risk Resolution ==
 
== Risk Resolution ==
 +
 +
== Risk Monitoring ==

Revision as of 18:59, 27 November 2012

Introduction

The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1.
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.

Risk Management Methodology

Identified Risks

Top Identified Risks

Risk Resolution

Risk Monitoring