(Created page with "{| align="right" || __TOC__ |} The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and ...")
 
Line 3: Line 3:
 
|}
 
|}
  
The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1. The contingency planning will be part of the DNA2.4 deliverable.
+
The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at [http://bscw.i-marine.research-infrastructures.eu/bscw/bscw.cgi/239724 DNA1.1]. The contingency planning will be part of the DNA2.4 deliverable.

Revision as of 17:53, 27 November 2012

The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1. The contingency planning will be part of the DNA2.4 deliverable.