Procedure QA Deployment

From D4Science Wiki
Revision as of 16:20, 18 February 2014 by Andrea.manzi (Talk | contribs) (Created page with "== Preparation of the QA validation plan == A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Preparation of the QA validation plan

A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The information about the components that are part of a release are listed in trac under the report

https://issue.imarine.research-infrastructures.eu/report/17

Each subsystem listed on the report includes different types of components to upgrade/install on the infrastructures. In order to understand what are the compos to include we have a list of assumption:

  • components coming from the subsystem :
    • org.portlets-*
    • org.portal-
    • org.gcube.application-support-layer.*

are components GUI side to to be installed only on the infrastructure portal

In addiction to these subsystem compos, some other GUI side components are part of the subsystems. org.gcube.application and org.gcube.messaging.