Difference between revisions of "JAVA 7 Infrastructure Deployment"
Andrea.manzi (Talk | contribs) |
Andrea.manzi (Talk | contribs) (→GHN and SmartGears distributions built with JAVA 7) |
||
Line 43: | Line 43: | ||
=== GHN and SmartGears distributions built with JAVA 7=== | === GHN and SmartGears distributions built with JAVA 7=== | ||
− | '''Description''': | + | '''Description''': Both the GHN and the SmartGears distributions built with java 7 need to be made available to the devs |
− | '''Responsible''': | + | '''Responsible''':CERN |
− | '''Deadline''' : | + | '''Deadline''' : Before the holidays |
− | '''Status''': | + | '''Status''': DONE |
− | + | ||
− | + | ||
+ | '''Related ticket''': [https://issue.imarine.research-infrastructures.eu/ticket/2443 2443] | ||
=== Development infra runtime upgrade to JAVA 7 === | === Development infra runtime upgrade to JAVA 7 === |
Revision as of 18:51, 14 January 2014
The deployment of a production infrastructure fully JAVA 7 based derives from a successfull integration of a gCube release with JAVA 7 ( 3.0.0). The integration of the gCube release 3.0.0 is on the other hand based on the successfully integration and test of the HEAD release.
HEAD test plan
The list of actions/tasks to be performed by both developers and integration team (2440) in order to be ready to release a fully java 7 based gCube release:
Modification to local development environment to use JAVA 7 (Oracle)
Description: All developers should check and upgrade their development environments ( and IDE) to use JAVA SE 7. ( distributed by Oracle). This applies to both Maven and not-Maven components.
Responsible: Development team
Deadline : 20/12/2013
Status: Ongoing
Related ticket: n/a
Modification to the maven-parent to use JAVA 7
Description: The maven-parent contains references to JAVA 6 build options. It should be upgraded to use JAVA 7
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2441
Switch the HEAD builds and nightlies to JAVA 7
Description: HEAD remote builds and Nightlies should be upgrade to run with JAVA 7.
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2442
GHNgCube Hosting Node. and SmartGears distributions built with JAVA 7
Description: Both the GHNgCube Hosting Node. and the SmartGears distributions built with java 7 need to be made available to the devs
Responsible:CERN
Deadline : Before the holidays
Status: DONE
Related ticket: 2443
Development infra runtime upgrade to JAVA 7
Description:
Responsible:
Deadline :
Status:
Related ticket:
Portal Bundle built with JAVA 7
Description:
Responsible:
Deadline :
Status:
Related ticket:
GHNgCube Hosting Node. and SmartGears JAVA 7 on the dev infra
Description:
Responsible:
Deadline :
Status:
Related ticket:
Development infra components upgrade to JAVA 7
Description:
Responsible:
Deadline :
Status:
Related ticket: