Difference between revisions of "JAVA 7 Infrastructure Deployment"

From D4Science Wiki
Jump to: navigation, search
(Switch the HEAD builds and nightlies to JAVA 7)
Line 1: Line 1:
== JAVA 7 deployment plan==
+
== JAVA 7 integration plan==
  
The deployment of a production infrastructure fully JAVA 7 based  derives from a successful list of actions/tasks to be performed by both developers and integration team ([https://issue.imarine.research-infrastructures.eu/ticket/2440 2440])
+
The deployment of a production infrastructure fully JAVA 7 based  derives from a successful list of actions/tasks to be performed by both developers and integration team ([https://issue.imarine.research-infrastructures.eu/ticket/2440 2440]) in order to be ready to release a fully java 7 based gCube release.
  
 
The following paragraphs  summarizes the activities to be performed:
 
The following paragraphs  summarizes the activities to be performed:

Revision as of 19:06, 16 December 2013

JAVA 7 integration plan

The deployment of a production infrastructure fully JAVA 7 based derives from a successful list of actions/tasks to be performed by both developers and integration team (2440) in order to be ready to release a fully java 7 based gCube release.

The following paragraphs summarizes the activities to be performed:

Modification to local development environment to use JAVA 7 (Oracle)

Description: All developers should check and upgrade their development environments ( and IDE) to use JAVA SE 7. ( distributed by Oracle). this aplles to both Maven and not-Maven components development)

Responsible: Development team

Deadline : 20/12/2013

Related ticket: n/a


Modification to the maven-parent to use JAVA 7

Description: The maven-parent contains references to JAVA 6 build options. It should be upgraded to use JAVA 7

Responsible: ENG

Deadline : 20/12/2013

Related ticket: 2441

Switch the HEAD builds and nightlies to JAVA 7

Description: HEAD remote builds and Nightlies should be upgrade to run with JAVA 7.

Responsible: ENG

Deadline : 20/12/2013

Related ticket: 2442

GHNgCube Hosting Node. and SmartGears distributions built with JAVA 7

Description:

Responsible:

Deadline :

Related ticket:


Development infra runtime upgrade to JAVA 7

Description:

Responsible:

Deadline :

Related ticket:


Portal Bundle built with JAVA 7

Description:

Responsible:

Deadline :

Related ticket:

GHNgCube Hosting Node. and SmartGears JAVA 7 on the dev infra

Description:

Responsible:

Deadline :

Related ticket:


Development infra components upgrade to JAVA 7

Description:

Responsible:

Deadline :

Related ticket: