Difference between revisions of "IMarine Data E-Infrastructure Deployment and Operation: Plan"

From D4Science Wiki
Jump to: navigation, search
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
This section describes the plan for the '''D4Science Ecosystem''' in terms of Resource Provisioning. In addition it describes the infrastructure upgrade plans, reporting as well its scheduled and unscheduled downtimes:
+
This section describes the plan for the iMarine resources joining the D4Science Ecosystem in terms of Hosting Resources provisioning.  
  
* [[WP5 Nodes Upgrade|Ecosystem Upgrade]],
+
In addition it describes the infrastructure upgrade plans, reporting as well its scheduled and unscheduled downtimes:
* [[WP5 Nodes Downtimes|Ecosystem Downtime]]
+
 
 +
* [[Hosting Resources Plan| Hosting Resources plan]]
 +
* [[Resources Upgrade| Resources Upgrade]]
 +
* [[Resources Downtimes| Resources Downtime]]
 +
* [[Secure Infrastructure Deployment| Secure Infrastructure Deployment]]
 +
* [[JAVA 7 Infrastructure Deployment| Java 7 Infrastructure Deployment]]
 +
* [[gCube Puppet integration| gCube Puppet integration]]
 +
* [[Social ISTI  installation| Social ISTI]]

Latest revision as of 22:29, 22 February 2014

This section describes the plan for the iMarine resources joining the D4ScienceAn e-Infrastructure operated by the D4Science.org initiative. Ecosystem in terms of Hosting Resources provisioning.

In addition it describes the infrastructure upgrade plans, reporting as well its scheduled and unscheduled downtimes: