Hosting Resources Plan

From D4Science Wiki
Jump to: navigation, search

The hosting resources plan to be allocated to the production infrastructure during the project in addition to the one reported in Hosting Resources. The table can report information about hosting hardware and virtualized resources. For this reason the column type should either report Hardware together with type of CPU or VM and the type of virtualization system.


Type RAM (GB) Storage (TB) CPUs
CNR
VM / Xen hypervisor 340 38 100
Subtotal 340 38 100
FAO
- - - -
Subtotal - - -
FIN
- - - -
Subtotal - - -
NKUA
VM / Xen hypervisor 64 3.35 32
Subtotal 64 3.35 32
ASGC Taiwan
- - - -
Subtotal - - -
ALL SITES
Total 404 41.35 132