Difference between revisions of "Hosting Resources Plan"
From D4Science Wiki
Andrea.manzi (Talk | contribs) |
Andrea.manzi (Talk | contribs) |
||
Line 14: | Line 14: | ||
|- | |- | ||
! bgcolor="lightgrey" align="center" colspan="6"|FAO | ! bgcolor="lightgrey" align="center" colspan="6"|FAO | ||
+ | |- | ||
+ | | - || - || - || - | ||
|- | |- | ||
| ''Subtotal'' || - || - || - | | ''Subtotal'' || - || - || - | ||
|- | |- | ||
! bgcolor="lightgrey" align="center" colspan="6"|FIN | ! bgcolor="lightgrey" align="center" colspan="6"|FIN | ||
+ | |- | ||
+ | | - || - || - || - | ||
|- | |- | ||
| ''Subtotal'' || - || - || - | | ''Subtotal'' || - || - || - |
Revision as of 16:27, 8 December 2011
The hosting resources plan to be allocated to the production infrastructure. The table can report information about hosting hardware and virtualized resources. For this reason the column type should either report Hardware together with type of CPU or VM and the type of virtualization system.
Type | RAM (GB) | Storage (TB) | CPUs | ||
---|---|---|---|---|---|
CNR | |||||
- | - | - | - | ||
Subtotal | - | - | - | ||
FAO | |||||
- | - | - | - | ||
Subtotal | - | - | - | ||
FIN | |||||
- | - | - | - | ||
Subtotal | - | - | - | ||
NKUA | |||||
- | - | - | - | ||
Subtotal | - | - | - | ||
ASGC Taiwan | |||||
- | - | - | - | ||
Subtotal | - | - | - | ||
ALL SITES | |||||
Total | - | - | - |