Procedure QA Deployment

From D4Science Wiki
Revision as of 15:36, 18 February 2014 by Andrea.manzi (Talk | contribs)

Jump to: navigation, search

Preparation of the QA validation plan

A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The information about the components that are part of a release are listed in trac under the report ( grouped by milestone)

https://issue.imarine.research-infrastructures.eu/report/17

Each subsystem listed on the report includes different types of components to upgrade/install on the infrastructure. In order to understand what are the components to include and how to plan the upgrade we have a list of known categories.

Bundle components

Belongs to this group of components the base containers of our infrastructure components:

  • org.gcube.portal.portal-bundle
  • org.gcube.distribution.ghn-distribution
  • org.gcube.distribution.smartgears-distribution

When a new version of these components is released we should check the impact in terms of libraries/configuration to upgrade and prepare upgrade scripts/detailed instructions.

Enabling Layer components

Belongs to these category the components that are the the enablers of our infrastructure, the base services that allows discovery, resource management, service deployments etc etc:

  • org.gcube.vre-management
  • org.gcube.information-system
  • org.gcube.vo-management
  • org.gcube.messaging
  • org.gcore

In addition the compos belonging to the following

Portal components

Components GUI side to to be installed only on the infrastructure portal:

  • org.portlets-*
  • org.portal-
  • org.gcube.application-support-layer.*

In addiction to these subsystem, some other GUI side components are part of the subsystems. org.gcube.application and org.gcube.messaging.

Those components represent the base