JAVA 7 Infrastructure Deployment
The deployment of a production infrastructure fully JAVA 7 based derives from a successfull integration of a gCube release with JAVA 7 ( 3.0.0). The integration of the gCube release 3.0.0 is on the other hand based on the successfully integration and test of the HEAD release.
HEAD test plan
The list of actions/tasks to be performed by both developers and integration team (2440) in order to be ready to release a fully java 7 based gCube release.
JAVA 7 on local env | maven parent | HEAD builds | Hosting nodes with JAVA 7 | Dev infra runtime with JAVA 7 | Portal bundle with JAVA 7 | Dev Hosting nodes upgrade | Runtime Resources Upgrade | Dev infra upgrade |
---|---|---|---|---|---|---|---|---|
All DEVs | ENG | ENG | CERN | All DEVs | CNR | All DEVs | CERN | All DEVs |
Modification to local development environment to use JAVA 7 (Oracle)
Description: All developers should check and upgrade their development environments ( and IDE) to use JAVA SE 7. ( distributed by Oracle). This applies to both Maven and not-Maven components.
Responsible: Development team
Deadline : 20/12/2013
Status: DONE
Related ticket: n/a
Modification to the maven-parent to use JAVA 7
Description: The maven-parent contains references to JAVA 6 build options. It should be upgraded to use JAVA 7
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2441
Switch the HEAD builds and nightlies to JAVA 7
Description: HEAD remote builds and Nightlies should be upgrade to run with JAVA 7.
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2442
GHNgCube Hosting Node. and SmartGears distributions built with JAVA 7
Description: Both the GHNgCube Hosting Node. and the SmartGears distributions built with java 7 need to be made available to the devs
Responsible:CERN
Deadline : Before the holidays
Status: DONE
Related ticket: 2443
Development infra runtime upgrade to JAVA 7
Description: the Development infra running environment should be upgraded to JAVA 7
Responsible: All Devs
Deadline : After the Holidays
Status: DONE
Related ticket: 2444
Portal Bundle built with JAVA 7
Description: the portal bundle should be built with JAVA 7 and install it on the dev infra
Responsible:CNR
Deadline : after the holidays
Status: DONE
Related ticket: 2448
GHNgCube Hosting Node. and SmartGears JAVA 7 on the dev infra
Description: the dev infra hosting nodes have to be upgraded to the latest versions built with java 7
Responsible: All Devs
Deadline : End of January
Status: ONGOING
Related ticket: 2445
Runtime Resource upgrade to JAVA 7
Description: The Runtime Resource deployed on the dev infra have to be upgrade to run with JAVA 7
Responsible: CERN
Deadline : End of January
Status: ONGOING
Related ticket: 2453
Development infra components upgrade to JAVA 7
Description: the dev infrastructure services and portlet should be reinstalled with the versions built with JAVA 7
Responsible: All devs
Deadline : End of January
Status: ONGOING
Related ticket: 2445
gCube 3.0.0 integration and deployment plan
gCube 3.0.0 preparation | gCube 3.0.0 release integration | gCube 3.0.0 QA validation | Preparation of the gCube 3.0.0 deployment plan | Deployment of gCube 3.0.0 in production |
---|---|---|---|---|
All DEVs | ENG | CERN | CERN | CERN |
gCube 3.0.0 release
Description: gCube 3.0.0 release configurations must be created on ETICS and branch on SVN
Responsible: Development team
Deadline : 07/02/2014
Status: ONGOING
Related ticket: n/a
gCube 3.0.0 release integration
Description: gCube 3.0.0 release builds and deployment tests
Responsible: ENG
Deadline : 21/02/2014
Status: ONGOING
Related ticket: n/a
gCube 3.0.0 QA validation
Description: gCube 3.0.0 QA validation
Responsible: CERN
Deadline : 28/02/2014
Status: ONGOING
Related ticket: n/a
gCube 3.0.0 deployment plan
Description: gCube 3.0.0 deployment plan
Responsible: CERN
Deadline : 28/02/2014
Status: ONGOING
Related ticket: n/a
gCube 3.0.0 production deployment
Description: gCube 3.0.0 production deployment
Responsible: CERN
Deadline : 7/03/2014
Status: N/A