This page keeps track of all declared scheduled downtimes.


Start Date End Date Affected Scopes Affected Resources Downtime duration (hours) Motivation
21/12/11 21/12/11 infrastructure All 8 infrastructure Upgrade to gCube 2.7.2
27/01/12 03/02/12 infrastructure GRID site @NKUA n/a middleware upgrade to UMD 1
03/02/12 03/02/12 AquaMaps All n/a Server@Kiel Maintenance
16/02/12 16/02/12 Infrastructure All 8 infrastructure Upgrade to gCube 2.7.3
12/03/12 12/03/12 Portal All 8 new iMarine portal installation and partial Upgrade to gCube 2.8.0
13/03/12 13/03/12 AquaMaps All n/a Server@Kiel Maintenance
23/03/12 23/03/12 AquaMaps All n/a Server@Kiel Maintenance
30/03/12 30/03/12 FARM and gCubeApps VOVirtual Organization; All 4 Infrastructure upgrade to gCube 2.8.0
30/03/12 30/03/12 Ecosystem All 4 Infrastructure upgrade to gCube 2.8.0 and new D4ScienceAn e-Infrastructure operated by the D4Science.org initiative. Gateway installation
30/04/12 30/04/12 Infrastructure All 8 Infrastructure upgrade to gCube 2.8.1
28/05/12 1/06/12 infrastructure GRID site @CNR n/a middleware upgrade to UMD 1
13/06/12 13/06/12 Infrastructure All 8 Infrastructure upgrade to gCube 2.9.0
30/06/12 2/07/12 Infrastructure All n/a CNR site power cut
12/07/12 12/07/12 Hadoop All n/a Hadoop Cluster upgrade to Cloudera 4
13/07/12 13/07/12 Infrastructure All 8 Complete the Infrastructure upgrade to gCube 2.9.0
1/08/12 1/08/12 Infrastructure All 4 Infrastructure upgrade to gCube 2.9.1
26/10/12 26/10/12 Infrastructure All 8 Infrastructure upgrade to gCube 2.11.0
13/11/12 13/11/12 Infrastructure All 24 NKUA site network problem
10/12/12 10/12/12 Infrastructure All 4 Infrastructure upgrade to gCube 2.11.1
11/01/13 14/01/13 infrastructure All 76 CNR and NKUA sites power cuts
20/02/13 20/02/13 infrastructure All 8 Infrastructure upgrade to gCube 2.12.0
1/03/13 6/03/13 infrastructure GRID site @CNR n/a middleware upgrade to UMD 2
1/03/13 6/03/13 infrastructure GRID site @NKUA n/a middleware upgrade to UMD 2
18/03/13 18/03/13 infrastructure all 8 Infrastructure upgrade to gCube 2.13.0
23/04/13 23/04/13 infrastructure all 5 HW issue @CNR site
10/05/13 10/05/13 infrastructure all 8 Infrastructure upgrade to gCube 2.14.0
12/06/13 12/06/13 infrastructure all 8 Infrastructure upgrade to gCube 2.15.0
28/06/13 28/06/13 infrastructure NKUA site 6 DNS issue on NKUA network
31/07/13 31/07/13 infrastructure all 8 Infrastructure upgrade to gCube 2.16.0
20/09/13 20/09/13 infrastructure all 4 Infrastructure upgrade to gCube 2.16.1
02/12/13 02/12/13 infrastructure all 8 Infrastructure upgrade to gCube 2.17.0
23/12/13 23/12/13 infrastructure all 3 Infrastructure upgrade to gCube 2.17.1
15/01/14 15/01/14 infrastructure NKUA site 0.5 network maintenance
12/03/14 12/03/14 infrastructure CNR site 2 HW issue @CNR site
19/03/14 19/03/14 infrastructure all 8 Infrastructure upgrade to gCube 3.0.0
12/05/14 12/05/14 infrastructure all 8 Infrastructure upgrade to gCube 3.1.0
04/06/14 04/06/14 infrastructure node47.p, node82.p, portal.i-marine 0.5 Infrastructure upgrade to gCube 3.1.1
19/06/14 19/06/14 infrastructure all 8 Infrastructure upgrade to gCube 3.2.0
17/07/14 17/07/14 infrastructure all 8 Infrastructure upgrade to gCube 3.3.0
25/09/14 25/09/14 infrastructure all 8 Infrastructure upgrade to gCube 3.4.0
12/11/14 12/11/14 infrastructure all 8 Infrastructure upgrade to gCube 3.5.0
16/12/14 16/12/14 infrastructure all 8 Infrastructure upgrade to gCube 3.5.1
26/02/15 26/02/15 infrastructure all 8 Infrastructure upgrade to gCube 3.6.0
14/05/15 14/05/15 infrastructure all 8 Infrastructure upgrade to gCube 3.7.0


Possible Motivation:

  • infrastructure Upgrade
  • Site Unavailability