Difference between revisions of "Procedure QA Deployment"
Andrea.manzi (Talk | contribs) (Created page with "== Preparation of the QA validation plan == A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The ...") |
Andrea.manzi (Talk | contribs) (→Preparation of the QA validation plan) |
||
Line 1: | Line 1: | ||
== Preparation of the QA validation plan == | == Preparation of the QA validation plan == | ||
− | A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The information about the components that are part of a release are listed in trac under the report | + | A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The information about the components that are part of a release are listed in trac under the report ( grouped by milestone) |
https://issue.imarine.research-infrastructures.eu/report/17 | https://issue.imarine.research-infrastructures.eu/report/17 | ||
− | Each subsystem listed on the report includes different types of components to upgrade/install on the | + | Each subsystem listed on the report includes different types of components to upgrade/install on the infrastructure. In order to understand what are the components to include and how to plan the upgrade we have a list of known categories. |
− | + | === Bundle components === | |
− | ** org. | + | |
− | ** org.portal- | + | Belongs to this group of components the base containers and enablers of our infrastructure: |
− | + | ||
+ | * org.gcube.portal.portal-bundle | ||
+ | * org.gcube.distribution.ghn-distribution | ||
+ | * org.gcube.distribution.smartgears-distribution | ||
+ | |||
+ | When a new version of these components is released we should check the impact in terms of libraries/configuration to upgrade and prepare upgrade scripts/detailed instructions. | ||
+ | |||
+ | |||
+ | === Portal components === | ||
+ | |||
+ | Components GUI side to to be installed only on the infrastructure portal: | ||
+ | |||
+ | * org.portlets-* | ||
+ | * org.portal- | ||
+ | * org.gcube.application-support-layer.* | ||
− | + | In addiction to these subsystem, some other GUI side components are part of the subsystems. org.gcube.application and org.gcube.messaging. | |
− | + | Those components represent the base |
Revision as of 15:29, 18 February 2014
Preparation of the QA validation plan
A gCube release result of the integration activity implemented by WP7 could include a high number of new and upgrade components. The information about the components that are part of a release are listed in trac under the report ( grouped by milestone)
https://issue.imarine.research-infrastructures.eu/report/17
Each subsystem listed on the report includes different types of components to upgrade/install on the infrastructure. In order to understand what are the components to include and how to plan the upgrade we have a list of known categories.
Bundle components
Belongs to this group of components the base containers and enablers of our infrastructure:
- org.gcube.portal.portal-bundle
- org.gcube.distribution.ghn-distribution
- org.gcube.distribution.smartgears-distribution
When a new version of these components is released we should check the impact in terms of libraries/configuration to upgrade and prepare upgrade scripts/detailed instructions.
Portal components
Components GUI side to to be installed only on the infrastructure portal:
- org.portlets-*
- org.portal-
- org.gcube.application-support-layer.*
In addiction to these subsystem, some other GUI side components are part of the subsystems. org.gcube.application and org.gcube.messaging.
Those components represent the base