Difference between revisions of "Procedure Downtime Declaration"
Andrea.manzi (Talk | contribs) |
Andrea.manzi (Talk | contribs) |
||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
Any scheduled downtime must be announced in advance to the user communities. The announcement is done by the [[Role Infrastructure Manager|Infrastructure Manager]], [[Role VO Admin|VO Admin]] or [[Role VRE Manager|VRE Manager]] exploiting the facilities offered on each VO/VRE by the Resource Management portlet. | Any scheduled downtime must be announced in advance to the user communities. The announcement is done by the [[Role Infrastructure Manager|Infrastructure Manager]], [[Role VO Admin|VO Admin]] or [[Role VRE Manager|VRE Manager]] exploiting the facilities offered on each VO/VRE by the Resource Management portlet. | ||
Line 6: | Line 7: | ||
Information about all declared scheduled downtimes is gathered [[Resources Downtimes|here]]. | Information about all declared scheduled downtimes is gathered [[Resources Downtimes|here]]. | ||
− | |||
== gCube Resources == | == gCube Resources == |
Revision as of 13:12, 8 December 2011
The downtime can be caused by (1) an infrastructure/VOVirtual Organization;/VREVirtual Research Environment. upgrade or (2) the unavailability of nodes (check below). In this second case, different procedures apply whether the unavailability affects gCube nodes, gLite nodes or Hadoop nodes. In any case, the Infrastructure Manager, VO Admin or VRE Manager must analyse the impact of the nodes unavailability and declare the appropriate downtime.
Information about all declared scheduled downtimes is gathered here.
gCube Resources
The unavailability of gCube resources must be declared by the Site Manager by sending an email to the WP5 mailing list. The email must contain information about the unavailability duration as well as a list of the affected resources.
gLite Resources
The unavailability of gLite resources must be declared by the Site Manager following the EGI downtime procedure. Site Managers must declare the unavailability using the GOCDB website in the section related to their site.
Hadoop Resources
The unavailability of Hadoop resources must be declared by the Site Manager by sending an email to the WP5 mailing list. The email must contain information about the unavailability duration as well as a list of the affected resources.
Runtime Resources
The unavailability of Runtime resources must be declared by the Site Manager by sending an email to the WP5 mailing list. The email must contain information about the unavailability duration as well as a list of the affected resources.