Difference between revisions of "29.04.2014 X-Link and Chimaera"
From D4Science Wiki
(→Actions) |
(→Actions) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
==Discussion Summary== | ==Discussion Summary== | ||
− | * Claudio presented some slides regarding the X-Link - Chimaera integration and the tasks/activities that are required towards this integration. | + | * Claudio presented some slides regarding the X-Link - Chimaera integration and the tasks/activities that are required towards this integration.[https://www.dropbox.com/s/abqtgc2310rzu37/xlink%20for%20chimaera.pdf link to ppt] |
* Pavlos detailed what it is required in order to start implementing an extension of X-Link. Specifically, | * Pavlos detailed what it is required in order to start implementing an extension of X-Link. Specifically, | ||
** The files processors for each format. | ** The files processors for each format. | ||
Line 27: | Line 27: | ||
* Claudio said that he is busy on May, but he will try to collect/prepare what it is needed and send them to Pavlos. | * Claudio said that he is busy on May, but he will try to collect/prepare what it is needed and send them to Pavlos. | ||
* Pavlos said that the main risk is the existence of possible dependencies of the data/information that will be sent by Claudio. | * Pavlos said that the main risk is the existence of possible dependencies of the data/information that will be sent by Claudio. | ||
+ | * Lino suggested to use tickets for tracking the corresponding activities. Pavlos and Claudio agreed. | ||
==Actions== | ==Actions== | ||
− | * Claudio will | + | * Claudio will create one ticket in correspondence of each identified task to carry out the adoption of xLink in Chimaera |
− | * Claudio will | + | * Claudio will deliver a documentation of technical specifications for Pavlos in order to let him start the work during May; this will require checkpoints along the development of the work between FAO-FORTH. |
− | * | + | * FORTH will start implementing the X-Link extension |
+ | * Claudio will keep up with the update of xLink to ensure that requirements are respected and take over the work as soon as feasible (mainly towards the end of May) |
Latest revision as of 19:00, 5 May 2014
Agenda
Tue, April 29, 17:00 – 18:00 (EEST)
- Presentation by Claudio of the idea of X-Link - Chimaera integration
- Description of foreseen activities for this integration
- Discussion on possible work plan and proposal for a road map (Resource needed + milestones)
- Wrap up and decision on the feasibility of this task
Participants
- Pasquale Pagano (CNR)
- Claudio Baldassarre (FAO)
- Anton Ellenbroek (FAO)
- Yann Laurent (FAO)
- Pavlos Fafalios (FORTH)
- Manolis Baritakis (FORTH)
Discussion Summary
- Claudio presented some slides regarding the X-Link - Chimaera integration and the tasks/activities that are required towards this integration.link to ppt
- Pavlos detailed what it is required in order to start implementing an extension of X-Link. Specifically,
- The files processors for each format.
- Details of the Knowledge Base that will be exploited for the entity linking process (e.g. its SPARQL endpoint, etc.).
- The code (and the JSON structure) for populating the index
- More details of the index (that is hosted by NKUA), e.g. how one can access the index, its structure, etc.
- Pavlos said that he can dedicate much effort on May and that the idea scenario is to have a first version of the X-Link extension at the end of May. On June, he can dedicate time only at the end of the month (after 24).
- Claudio said that he is busy on May, but he will try to collect/prepare what it is needed and send them to Pavlos.
- Pavlos said that the main risk is the existence of possible dependencies of the data/information that will be sent by Claudio.
- Lino suggested to use tickets for tracking the corresponding activities. Pavlos and Claudio agreed.
Actions
- Claudio will create one ticket in correspondence of each identified task to carry out the adoption of xLink in Chimaera
- Claudio will deliver a documentation of technical specifications for Pavlos in order to let him start the work during May; this will require checkpoints along the development of the work between FAO-FORTH.
- FORTH will start implementing the X-Link extension
- Claudio will keep up with the update of xLink to ensure that requirements are respected and take over the work as soon as feasible (mainly towards the end of May)