Difference between revisions of "Risk Analysis and Risk Response"

From D4Science Wiki
Jump to: navigation, search
Line 10: Line 10:
  
 
== Identified Risks ==
 
== Identified Risks ==
 +
 +
== Risk Monitoring ==
  
 
== Top Identified Risks ==
 
== Top Identified Risks ==
  
 
== Risk Resolution Methodology ==
 
== Risk Resolution Methodology ==
 
== Risk Monitoring ==
 

Revision as of 19:24, 27 November 2012

Introduction

The goal of the risk analysis and risk response activity is to provide the consortium with guidelines and instruments for managing the actual and potential risks that can occur during the project's lifetime. The full risk management procedure and methodology is available at DNA1.1.
The contingency planning will be part of the DNA2.4 deliverable and as of type "Other" this page will be used to serve the main content of the deliverable.

Risk Management Methodology

Identified Risks

Risk Monitoring

Top Identified Risks

Risk Resolution Methodology