Difference between revisions of "JAVA 7 Infrastructure Deployment"
Andrea.manzi (Talk | contribs) (→HEAD test plan) |
Andrea.manzi (Talk | contribs) (→gCube 3.0.0 integration plan) |
||
Line 147: | Line 147: | ||
== gCube 3.0.0 integration plan== | == gCube 3.0.0 integration plan== | ||
+ | |||
+ | {| border="1" cellpadding="4" cellspacing="0" valign="top" | ||
+ | ! width="80" align="center"| [[JAVA_7_Infrastructure_Deployment#Modification_to_local_development_environment_to_use_JAVA_7_.28Oracle.29| JAVA 7 on local env]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Modification_to_the_maven-parent_to_use_JAVA_7| maven parent]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Switch_the_HEAD_builds_and_nightlies_to_JAVA_7 | HEAD builds]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#GHN_and_SmartGears_distributions_built_with_JAVA_7| Hosting nodes with JAVA 7]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Development_infra_runtime_upgrade_to_JAVA_7| Dev infra runtime with JAVA 7]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Portal_Bundle_built_with_JAVA_7| Portal bundle with JAVA 7]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#GHN_and_SmartGears_JAVA_7_on_the_dev_infra| Dev Hosting nodes upgrade]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Runtime_Resource_upgrade_to_JAVA_7| Runtime Resources Upgrade]] | ||
+ | !! width="80" align="center"|[[JAVA_7_Infrastructure_Deployment#Development_infra_components_upgrade_to_JAVA_7| Dev infra upgrade]] | ||
+ | |- | ||
+ | | align="center" | All DEVs | ||
+ | | align="center" | ENG | ||
+ | | align="center" | ENG | ||
+ | | align="center" | CERN | ||
+ | | align="center" | All DEVs | ||
+ | | align="center" | CNR | ||
+ | | align="center" | All DEVs | ||
+ | | align="center" | CERN | ||
+ | | align="center" | All DEVs | ||
+ | |||
+ | |- | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="green" | | ||
+ | | bgcolor="yellow" | | ||
+ | | bgcolor="yellow" | | ||
+ | | bgcolor="yellow" | | ||
+ | |} |
Revision as of 09:26, 5 February 2014
The deployment of a production infrastructure fully JAVA 7 based derives from a successfull integration of a gCube release with JAVA 7 ( 3.0.0). The integration of the gCube release 3.0.0 is on the other hand based on the successfully integration and test of the HEAD release.
HEAD test plan
The list of actions/tasks to be performed by both developers and integration team (2440) in order to be ready to release a fully java 7 based gCube release.
JAVA 7 on local env | maven parent | HEAD builds | Hosting nodes with JAVA 7 | Dev infra runtime with JAVA 7 | Portal bundle with JAVA 7 | Dev Hosting nodes upgrade | Runtime Resources Upgrade | Dev infra upgrade |
---|---|---|---|---|---|---|---|---|
All DEVs | ENG | ENG | CERN | All DEVs | CNR | All DEVs | CERN | All DEVs |
Modification to local development environment to use JAVA 7 (Oracle)
Description: All developers should check and upgrade their development environments ( and IDE) to use JAVA SE 7. ( distributed by Oracle). This applies to both Maven and not-Maven components.
Responsible: Development team
Deadline : 20/12/2013
Status: DONE
Related ticket: n/a
Modification to the maven-parent to use JAVA 7
Description: The maven-parent contains references to JAVA 6 build options. It should be upgraded to use JAVA 7
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2441
Switch the HEAD builds and nightlies to JAVA 7
Description: HEAD remote builds and Nightlies should be upgrade to run with JAVA 7.
Responsible: ENG
Deadline : 20/12/2013
Status: DONE
Related ticket: 2442
GHNgCube Hosting Node. and SmartGears distributions built with JAVA 7
Description: Both the GHNgCube Hosting Node. and the SmartGears distributions built with java 7 need to be made available to the devs
Responsible:CERN
Deadline : Before the holidays
Status: DONE
Related ticket: 2443
Development infra runtime upgrade to JAVA 7
Description: the Development infra running environment should be upgraded to JAVA 7
Responsible: All Devs
Deadline : After the Holidays
Status: DONE
Related ticket: 2444
Portal Bundle built with JAVA 7
Description: the portal bundle should be built with JAVA 7 and install it on the dev infra
Responsible:CNR
Deadline : after the holidays
Status: DONE
Related ticket: 2448
GHNgCube Hosting Node. and SmartGears JAVA 7 on the dev infra
Description: the dev infra hosting nodes have to be upgraded to the latest versions built with java 7
Responsible: All Devs
Deadline : End of January
Status: ONGOING
Related ticket: 2445
Runtime Resource upgrade to JAVA 7
Description: The Runtime Resource deployed on the dev infra have to be upgrade to run with JAVA 7
Responsible: CERN
Deadline : End of January
Status: ONGOING
Related ticket: 2453
Development infra components upgrade to JAVA 7
Description: the dev infrastructure services and portlet should be reinstalled with the versions built with JAVA 7
Responsible: All devs
Deadline : End of January
Status: ONGOING
Related ticket: 2445
gCube 3.0.0 integration plan
JAVA 7 on local env | maven parent | HEAD builds | Hosting nodes with JAVA 7 | Dev infra runtime with JAVA 7 | Portal bundle with JAVA 7 | Dev Hosting nodes upgrade | Runtime Resources Upgrade | Dev infra upgrade |
---|---|---|---|---|---|---|---|---|
All DEVs | ENG | ENG | CERN | All DEVs | CNR | All DEVs | CERN | All DEVs |