Difference between revisions of "JAVA 7 Infrastructure Deployment"

From D4Science Wiki
Jump to: navigation, search
(Modification to the maven-parent to use JAVA 7)
(Switch the HEAD builds and nightlies to JAVA 7)
Line 28: Line 28:
 
=== Switch the HEAD builds and nightlies to JAVA 7===
 
=== Switch the HEAD builds and nightlies to JAVA 7===
  
'''Description''':  
+
'''Description''': HEAD  remote builds and Nightlies should be upgrade to run with JAVA 7.
 
   
 
   
'''Responsible''':
+
'''Responsible''': ENG
  
'''Deadline''' :
+
'''Deadline''' : 20/12/2013
  
'''Related ticket''':
+
'''Related ticket'': [https://issue.imarine.research-infrastructures.eu/ticket/2442]
 
+
 
+
([https://issue.imarine.research-infrastructures.eu/ticket/2442])
+
  
 
=== GHN and SmartGears distributions  built with JAVA 7===
 
=== GHN and SmartGears distributions  built with JAVA 7===

Revision as of 19:05, 16 December 2013

JAVA 7 deployment plan

The deployment of a production infrastructure fully JAVA 7 based derives from a successful list of actions/tasks to be performed by both developers and integration team (2440)

The following paragraphs summarizes the activities to be performed:

Modification to local development environment to use JAVA 7 (Oracle)

Description: All developers should check and upgrade their development environments ( and IDE) to use JAVA SE 7. ( distributed by Oracle). this aplles to both Maven and not-Maven components development)

Responsible: Development team

Deadline : 20/12/2013

Related ticket: n/a


Modification to the maven-parent to use JAVA 7

Description: The maven-parent contains references to JAVA 6 build options. It should be upgraded to use JAVA 7

Responsible: ENG

Deadline : 20/12/2013

Related ticket: 2441

Switch the HEAD builds and nightlies to JAVA 7

Description: HEAD remote builds and Nightlies should be upgrade to run with JAVA 7.

Responsible: ENG

Deadline : 20/12/2013

'Related ticket: [1]

GHNgCube Hosting Node. and SmartGears distributions built with JAVA 7

Description:

Responsible:

Deadline :

Related ticket:


Development infra runtime upgrade to JAVA 7

Description:

Responsible:

Deadline :

Related ticket:


Portal Bundle built with JAVA 7

Description:

Responsible:

Deadline :

Related ticket:

GHNgCube Hosting Node. and SmartGears JAVA 7 on the dev infra

Description:

Responsible:

Deadline :

Related ticket:


Development infra components upgrade to JAVA 7

Description:

Responsible:

Deadline :

Related ticket: